Sign In | Join Free | My ccnmag.com |
|
Brand Name : TORICH
Model Number : ASTM A182
Certification : ISO9001; ISO14001; TSI16949
Place of Origin : ZheJiang,CHINA
MOQ : 1ton
Price : negotiable
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 60000 Ton per year
Delivery Time : 30-35 days
Packaging Details : packing in wooden boxes or in hexagonal bundles
Product name : Stainless Flange 304 316 Stainless Steel LWN Long Weld Neck Flange For Pipe Connection
Product Keyword : Stianless Long Weld Neck Flange
Application : For petroleum, chemical, nuclear power plant, food manufacturing
Secondary : Non-secondary
Technology : Forging
Type : Long Weld Neck Flange
Quick detail:
Technical Standard:
HG20592,ASME B16.5,DIN2630WN,JIS2220PL,ASTM A182 etc
Material :
Stainless Steel | 304,316,316Ti,321 347 |
Alloy Steel | F11,F22,F91,F5,F9,F51 |
Duplex Stainless Steel | F51,F53,F55,F60 |
Size:
1/2”~240" (DN 15mm-DN 6000mm)
Application:
It is widely used in petroleum, chemical, nuclear power plant, food manufacturing, construction, shipbuilding, paper making, pharmaceutical and other industries. In pipeline engineering, flange is mainly used for pipeline connection.
1. Stainless steel flange is used to connect pipes.
2. Stainless steel flange is used to connect valve and pipe.
Produce method:
Raw materials --Testing-Under material--Forge--Forgings--Process--CNC Machining--CNC drilling--Clean--Package--Ship.
Certificate:
TUV,BV,ISO
Type:
(1)PL: PL Flange;
(2)WN: Weld Neck Flange
(3)SO: Slip On Flange
(4)BL: Blind Flange
(5)TH: Threaded Flange
(6)LWN: Long Weld Neck Flange
(7)SW: Socket Weld Flange
Torich supply fitting with nice quality and price
Product Show:
FAQ:
Q: Are you trading company or manufacturer?
A: We are a professional steel pipes materials manufacturer.
Q: How long is your delivery time?
A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.
Q: Do you provide free samples?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
![]() |
Duplex Stainless Steel Weld Neck Flange Non Secondary Images |